IMG_20191111_115612

Synthon Blansko 2019

Office building

Floor plan / Floor area: 74 x 20 m / 4,440 m²
Installation period: August – October 2019

Installation carried out by:
Site manager: Marek Ballon
Site preparation: Marie Fraňková

A new three-storey office building, originally designed as a monolithic structure.
By redesigning it from a monolithic structure to a prefabricated one and replacing parts of the walls and ceilings, we not only saved costs but, above all, accelerated the assembly of the entire building by several months. The assembly took place in the very confined conditions of the pharmaceutical company’s premises.