Administrative, production and storage building.
Floor plan / Floor area: 25 x 34, 54 x 26 and 23 x 13 m / 4,500 m²
Construction period: June – August 2019
Installation carried out by:
Site manager: Marek Ballon
Site preparation: Marie Fraňková
The project involved the construction of the multi-storey office building S0 01a, the storage facility S01 b for metallurgical materials, and the storage facility S01 c for salt and gritting materials. The project was manufactured and assembled in accordance with the planned schedule.